Non-availability of the unit during post-qualification

Go down

Non-availability of the unit during post-qualification

Post by Mikel on Wed Aug 31, 2011 10:28 am

an LGU bidded out a procurement for one unit of fire truck, a bidder was declared with the LCB and was subsequently post qualified. During the post-qual, it was found out that the unit to be delivered was not yet available for testing, as the same is still to be assembled, could this (the unavailability) be a ground for disqualification? Thanks.