Post by Jack909 on Wed Sep 14, 2011 5:07 pm

Hi, it's me again. Ano ang dapat gawin pag 10 months delayed ang progress billing? Sa side ng contractor na comply lahat at nai submit ang nasa check list ung kulang na document/ attachment ay maggagaling sa Procurring Entity at wala akong control doon. I dini delay ang release ng document paisa isa. Alam naman natin na pag na delay ang payments masisira ang cash flow ng contractor. Hind ba magbayad ang Procurring Entity ng penalty sa contractor sa delayed in payments? Thanks in advance.


Last edited by Jack909 on Wed Sep 14, 2011 5:37 pm; edited 1 time in total (Reason for editing : Additional Information)

Jack909
New Member
New Member

Female Number of posts : 12
Company/Agency : JB Construction
Occupation/Designation : Businesswoman
Registration date : 2011-09-08

Back to top Go down

Re: Delayed in Payments

Post by engrjhez® on Wed Sep 14, 2011 10:03 pm

Jack909 wrote:Hi, it's me again. Ano ang dapat gawin pag 10 months delayed ang progress billing? Sa side ng contractor na comply lahat at nai submit ang nasa check list ung kulang na document/ attachment ay maggagaling sa Procurring Entity at wala akong control doon. I dini delay ang release ng document paisa isa. Alam naman natin na pag na delay ang payments masisira ang cash flow ng contractor. Hind ba magbayad ang Procurring Entity ng penalty sa contractor sa delayed in payments? Thanks in advance.

May we know what document is it? If it is the inspection report or statement of work accomplished, the concerned should act on it promptly within five (5) working days (from receipt of your request for billing). If that is not satisfied, you may file complaint to the CSC or to the Office of the Ombudsman for violating RA 9485 (Anti-Red Tape Act).
avatar
engrjhez®
Grand Master
Grand Master

Male Number of posts : 2480
Age : 39
Company/Agency : City Government of Bacoor [Region IV-A, Province of Cavite]
Occupation/Designation : Office of the City Legal Service (OCLS) / Certified National Trainer - PhilGEPS
Registration date : 2008-10-31

http://www.bacoor.gov.ph

Back to top Go down

Delayed in payments

Post by Jack909 on Thu Sep 15, 2011 12:00 am

engrjhez salamat po sa reply nyo. COA inspection report po ang huling kulang dahil walang auditor na mag inspection kahit napakatagal na ng request. Yung ibang document piece by piece inilabas ng Procurring Entity as if na hindi nila alam ang mga document na manggagaling sa kanila. Ako rin po ung nagtanong re: advance payment. 4 tranches ung naging payment namin sa advance payment halos 8 months ang inabot bago mabayaran. Sa SCC sa bid docs walang provision na nakalagay tungkol Advance payment. Tapos sa progress billing ten months delay din po. Pwede po bang i terminate ko ang contract due to above mentioned problems? Napakahirap po kasi ng kalagayan namin. Pls guide me what to do.
By the way ano po ang ibig sabihin ng CSC?


Last edited by Jack909 on Thu Sep 15, 2011 12:37 am; edited 3 times in total (Reason for editing : Additional information)

Jack909
New Member
New Member

Female Number of posts : 12
Company/Agency : JB Construction
Occupation/Designation : Businesswoman
Registration date : 2011-09-08

Back to top Go down

Re: Delayed in Payments

Post by leobcaleja on Wed Mar 12, 2014 3:21 pm

Civil Service Commission.
avatar
leobcaleja
New Member
New Member

Male Number of posts : 49
Company/Agency : hanjin heavy industries and const. co., ltd.
Occupation/Designation : chief office engineer
Registration date : 2010-09-19

Back to top Go down

Re: Delayed in Payments

Post by engrjhez® on Tue Mar 18, 2014 12:14 am

Jack909 wrote:engrjhez salamat po sa reply nyo.  COA inspection report po ang huling kulang dahil walang auditor na mag inspection kahit napakatagal na ng request. Yung ibang document piece by piece inilabas ng Procurring Entity as if na hindi nila alam ang mga document na  manggagaling sa kanila.  Ako rin po ung nagtanong re: advance payment. 4 tranches ung naging payment namin sa advance payment halos 8 months ang inabot bago mabayaran. Sa  SCC sa bid docs walang provision na nakalagay tungkol Advance payment.  Tapos sa progress billing ten months delay din po. Pwede po bang i terminate ko ang contract due to above mentioned problems? Napakahirap po kasi ng kalagayan namin. Pls guide me what to do.
By the way  ano po ang ibig sabihin ng CSC?

GCC = General Conditions of the Contract
SCC = Special Conditions of the Contract

Mayroon po sa General Conditions of the Contract na provision sa remedy ninyo sa delayed payment ng Procuring Entity under GCC Clause 18(d)

(d) A payment certified by the Procuring Entity’s Representative is not paid by the Procuring Entity to the Contractor within eighty four (84) days from the date of the Procuring Entity’s Representative’s certificate;



avatar
engrjhez®
Grand Master
Grand Master

Male Number of posts : 2480
Age : 39
Company/Agency : City Government of Bacoor [Region IV-A, Province of Cavite]
Occupation/Designation : Office of the City Legal Service (OCLS) / Certified National Trainer - PhilGEPS
Registration date : 2008-10-31

http://www.bacoor.gov.ph

Back to top Go down

Re: Delayed in Payments

Post by Sponsored content


Sponsored content


Back to top Go down

View previous topic View next topic Back to top

- Similar topics

 
Permissions in this forum:
You cannot reply to topics in this forum