Latest topics
» Clarification on when to start the counting of contract period.
Yesterday at 10:07 pm by Jovinal

» BAC/TWG member
Fri May 18, 2012 5:50 pm by isabelo c. rodriguez

» RE: New Philgeps website address
Fri May 18, 2012 2:54 pm by econopharmatrading

» Re: ABC for Security and Janitorial Services
Thu May 17, 2012 9:24 am by misty

» re-allignment of budget of APP for other matters.
Thu May 17, 2012 8:25 am by marksolomon

» Posting@PhilGeps Website
Thu May 17, 2012 12:04 am by engrjhez®

» certificate of site inspection
Wed May 16, 2012 8:49 pm by RDV @ GP3i

» LEASE OF PROPERTY
Wed May 16, 2012 8:02 pm by Jovinal

» variation order, negotiated procurement
Wed May 16, 2012 7:42 pm by Jovinal

» Punchlisting
Wed May 16, 2012 2:50 pm by regina avelino


bidding for a Design and build of a Warehouse?

View previous topic View next topic Go down

bidding for a Design and build of a Warehouse?

Post by arch.jdy on Thu Nov 03, 2011 5:05 pm


Anybody have done this before? need some guidance on this...

arch.jdy
New Member
New Member

Female Number of posts: 12
Company/Agency: GOCC
Occupation/Designation: Arch.bishop
Registration date: 2011-10-28

Back to top Go down

Re: bidding for a Design and build of a Warehouse?

Post by engrjhez® on Fri Nov 04, 2011 9:01 am

j_yodics wrote:
Anybody have done this before? need some guidance on this...


Please click on this link >>> http://www.gppb.gov.ph/issuances/Guidelines/2007/Design%20and%20Build%20Scheme.pdf

engrjhez®
Grand Master
Grand Master

Male Number of posts: 2046
Age: 33
Company/Agency: LGU-Bacoor [Region IV-A, Province of Cavite]
Occupation/Designation: Chief, Administrative Division - Engineering Office / Head, BAC Secretariat / PhilGEPS Trainer
Registration date: 2008-10-31

http://www.bacoor.gov.ph

Back to top Go down

Re: bidding for a Design and build of a Warehouse?

Post by arch.jdy on Fri Nov 04, 2011 9:44 am

Thanks Sir. have you done this already Sir? How long does the process take?

arch.jdy
New Member
New Member

Female Number of posts: 12
Company/Agency: GOCC
Occupation/Designation: Arch.bishop
Registration date: 2011-10-28

Back to top Go down

Re: bidding for a Design and build of a Warehouse?

Post by engrjhez® on Fri Nov 04, 2011 11:44 am

If done right, it may take 3-4 months. Yet Design and Build is just a scheme. It is still an infra project mixed with certain consultancy. You still have to pass the requirements/conditions on the use of D&B.

A (personally) recommended option is to procure for consulting services first (which may take up to 4-5 months) with the design as the deliverable and then procure as infra project later by contract (which may take 2-3 months). Smile

engrjhez®
Grand Master
Grand Master

Male Number of posts: 2046
Age: 33
Company/Agency: LGU-Bacoor [Region IV-A, Province of Cavite]
Occupation/Designation: Chief, Administrative Division - Engineering Office / Head, BAC Secretariat / PhilGEPS Trainer
Registration date: 2008-10-31

http://www.bacoor.gov.ph

Back to top Go down

Re: bidding for a Design and build of a Warehouse?

Post by arch.jdy on Fri Nov 04, 2011 12:32 pm

Yes Sir that is really the simplest procedure, but the management want to try the D&B approach which they want to use as template for the other project...

arch.jdy
New Member
New Member

Female Number of posts: 12
Company/Agency: GOCC
Occupation/Designation: Arch.bishop
Registration date: 2011-10-28

Back to top Go down

Re: bidding for a Design and build of a Warehouse?

Post by engrjhez® on Fri Nov 04, 2011 3:21 pm

j_yodics wrote:Yes Sir that is really the simplest procedure, but the management want to try the D&B approach which they want to use as template for the other project...


On the contrary, I think the consulting+infra scheme is simpler than the design and build scheme. Plus, the Procuring Entity has greater options in the implementation. Later on after the structure has been constructed, other portion of works can be done "by administration".

D&B is shall I say the fastest way to expedite procurement proceedings that is why one of the qualifying reasons is when tit involves flagship projects but it is not necessarily simpler and not at all cases most advantageous to the GOP. Smile

engrjhez®
Grand Master
Grand Master

Male Number of posts: 2046
Age: 33
Company/Agency: LGU-Bacoor [Region IV-A, Province of Cavite]
Occupation/Designation: Chief, Administrative Division - Engineering Office / Head, BAC Secretariat / PhilGEPS Trainer
Registration date: 2008-10-31

http://www.bacoor.gov.ph

Back to top Go down

Re: bidding for a Design and build of a Warehouse?

Post by arch.jdy on Fri Nov 04, 2011 5:18 pm

that's what i mean Sir. the Consulting service then have the infra project bidded out separately is much simpler. Anybody here have done the Design & Build approach?

arch.jdy
New Member
New Member

Female Number of posts: 12
Company/Agency: GOCC
Occupation/Designation: Arch.bishop
Registration date: 2011-10-28

Back to top Go down

View previous topic View next topic Back to top

- Similar topics

Permissions in this forum:
You cannot reply to topics in this forum