Latest topics
» No Objection Letter
Sat Dec 16, 2017 5:21 pm by zeph03

» CATERING SERVICES FOR CONGRESSIONAL MEET AT SAGBAYAN, BOHOL
Thu Dec 14, 2017 7:14 pm by btorres4

» PURCHASE OF FERTILIZERS FOR LIVESTOCK, CORN, HVCDP, INLAND FISHERY, AND ORGANIC PROGRAM
Thu Dec 14, 2017 4:35 pm by btorres4

» Newspaper Publication
Thu Dec 14, 2017 4:10 pm by btorres4

» RENTAL OF LIGHTS AND SOUND SYSTEM
Thu Dec 14, 2017 3:46 pm by btorres4

» Newspaper Publication
Wed Dec 13, 2017 9:50 pm by btorres4

» PURCHASE OF OTHER SUPPLIES FOR SB OFFICE
Wed Dec 13, 2017 4:51 pm by btorres4

» PURCHASE OF RICE FOR FOOD SUPPLIES OF PEACE & ORDER CAMPAIGN
Wed Dec 13, 2017 3:19 pm by btorres4

» Expired Tax Clearance during payment
Wed Dec 13, 2017 3:11 pm by vallemaco6224

» PURCHASE OF MEDICINE FOR MHO
Wed Dec 13, 2017 2:53 pm by btorres4


Posting of infra and goods..........

View previous topic View next topic Go down

Posting of infra and goods..........

Post by slayer on Thu Feb 12, 2009 11:02 pm

Good day again to all. I woud like to share my thoughts about advertising an infra projects and goods projects.

It is right for infra projects that we have 7 days for LOI, another 7 days for eligibility doccuments, another 7 days for selling of tender documents, another 7 days for opening of bids. A total of 28 days

For goods we are obseving 14 days selling of tender documents and another 7 days for eligibility check and opening of bids. Together on the same day.

Do we have the right procedure? Any suggestions or comments? Thanks and Godbless

slayer
New Member
New Member

Male Number of posts : 39
Company/Agency : Government Employee
Occupation/Designation : BAC Staff
Registration date : 2009-02-12

Back to top Go down

Posting of Infra and Goods

Post by RDV @ GP3i on Fri Feb 13, 2009 11:52 am

Archiekins:

For infra, the LOI should be received by the BAC within 7 c.d. from the last day of the posting period of 7 c.d. (Sec. 21.3.1, IRR-A). For example, if the posting period is from Feb. 1 to 8, the LOI should be received not later than Feb. 15.

Sec. 21.2.2 of IRR-A also provides that the maximum period from date of advertisement and/or first day of posting of the IAEB up to bid opening shall be 36 c.d. (for projects with ABC of P50M and below) and 50 c.d. (for projects above P50M). In the same example as above, if our ABC is less than P50M, the bid opening should not be later than March 9.

Another paragraph of the same section provides:
For infrastructure projects and consulting services, the eligibility documents shall be issued and made available at the time the IAEB is advertised or posted. The bidding documents must be issued after the conduct of eligibility check and/or short-listing, and the same must be available for at least seven (7) calendar days from the date the bidding documents were first issued.

If we are going to add the 7 c.d. posting period to your total 28 days, it should be well within the maximum of 36 c.d. (for projects with ABC of P50M and below) from first day of posting to bid opening prescribed by the law.

For goods, the same section provides that a maximum period of 30 c.d. from date of advertisement and/or first day of posting of the IAEB up to opening of bids. Your total 21 days plus 7 c.d. posting period is also within the maximum period of 30 c.d. prescribed by the law.

In other words, you had the right procedure.

RDV
avatar
RDV @ GP3i
Grand Master
Grand Master

Male Number of posts : 1611
Company/Agency : DBM-Reg'l Office IV-B
Occupation/Designation : Regional Director/ Procurement Trainer
Registration date : 2008-09-04

http://gppphil.org/

Back to top Go down

Re: Posting of infra and goods..........

Post by slayer on Fri Feb 13, 2009 8:36 pm

Thanks a lot sir for your reponse. A Million thanks

slayer
New Member
New Member

Male Number of posts : 39
Company/Agency : Government Employee
Occupation/Designation : BAC Staff
Registration date : 2009-02-12

Back to top Go down

Posting of Infra and Goods

Post by RDV @ GP3i on Mon Feb 16, 2009 11:15 am

My pleasure, Archiekins Very Happy
avatar
RDV @ GP3i
Grand Master
Grand Master

Male Number of posts : 1611
Company/Agency : DBM-Reg'l Office IV-B
Occupation/Designation : Regional Director/ Procurement Trainer
Registration date : 2008-09-04

http://gppphil.org/

Back to top Go down

Re: Posting of infra and goods..........

Post by engrjhez® on Wed Feb 18, 2009 10:59 pm

Hope this adds for your quick reference: (please click the link below)

[Revised GPPB Timelines]

Smile
avatar
engrjhez®
Grand Master
Grand Master

Male Number of posts : 2481
Age : 39
Company/Agency : City Government of Bacoor [Region IV-A, Province of Cavite]
Occupation/Designation : Office of the City Legal Service (OCLS) / Certified National Trainer - PhilGEPS
Registration date : 2008-10-31

http://www.bacoor.gov.ph

Back to top Go down

Re: Posting of infra and goods..........

Post by Sponsored content


Sponsored content


Back to top Go down

View previous topic View next topic Back to top

- Similar topics

 
Permissions in this forum:
You cannot reply to topics in this forum