Latest topics
» Lease of Office Space
Today at 9:58 am by judayski

» Supplemental Bid Bulliten
Sat Aug 19, 2017 7:57 pm by btorres4

» Financial requirement for joint venture
Fri Aug 18, 2017 10:31 am by candice

» settling requests for reconsideration re: liquidated damages
Fri Aug 18, 2017 8:49 am by regina avelino

» Annex H of the 2016 Revised Implementing Rules and Regulations
Fri Aug 18, 2017 8:38 am by regina avelino

» PhilGEPS membership requirement for Alternative Modes
Wed Aug 09, 2017 10:11 am by regina avelino

» Supply Officer as regular member of BAC
Wed Aug 09, 2017 10:01 am by regina avelino

» DOLE DA 18-A
Wed Aug 09, 2017 9:56 am by regina avelino

» Latest PCAB License
Thu Aug 03, 2017 5:26 pm by dagmars

» test papers for government schools
Tue Jul 18, 2017 8:47 am by regina avelino


Engineering Design, Supervision, Administrative and Other Cost (ESAO)

View previous topic View next topic Go down

Engineering Design, Supervision, Administrative and Other Cost (ESAO)

Post by dos_inhinyero_sivil on Fri Sep 14, 2012 5:19 pm

WHAT IS THE COVERAGE OF THE ESAO? DO WE HAVE THE GUIDELINES? ONLY DPWH HAS THE LEGAL BASIS ON THIS PURSUANT TO DEPARTMENT ORDER ISSUED IN 2003, I HOPE gppb WILL CLEAR THIS MATTER SO THAT OTHER GOVERNMENT AGENCIES MAY ADHERE?

dos_inhinyero_sivil
New Member
New Member

Male Number of posts : 19
Age : 50
Company/Agency : Philippine Public Safety College - DILG
Occupation/Designation : Engineer III- Head, BAC Secretariat
Registration date : 2012-07-02

http://www.ppsc.gov.ph

Back to top Go down

Re: Engineering Design, Supervision, Administrative and Other Cost (ESAO)

Post by engrjhez® on Sat Sep 15, 2012 10:57 am

dos_inhinyero_sivil wrote:WHAT IS THE COVERAGE OF THE ESAO? DO WE HAVE THE GUIDELINES? ONLY DPWH HAS THE LEGAL BASIS ON THIS PURSUANT TO DEPARTMENT ORDER ISSUED IN 2003, I HOPE gppb WILL CLEAR THIS MATTER SO THAT OTHER GOVERNMENT AGENCIES MAY ADHERE?

There are already updated guidelines from DPWH regarding computation of markups under the regime of Sec.Singson. There is no specific rule and application thereof outside DPWH. But such guidelines may be adopted by other agencies considering that DPWH is the prime agency for Infrastructure Projects.

Here's a link >>> http://www.dpwh.gov.ph/pdf/issuances/DO/11/DO_029_S2011.pdf

Smile
avatar
engrjhez®
Grand Master
Grand Master

Male Number of posts : 2480
Age : 39
Company/Agency : City Government of Bacoor [Region IV-A, Province of Cavite]
Occupation/Designation : Office of the City Legal Service (OCLS) / Certified National Trainer - PhilGEPS
Registration date : 2008-10-31

http://www.bacoor.gov.ph

Back to top Go down

Re: Engineering Design, Supervision, Administrative and Other Cost (ESAO)

Post by dos_inhinyero_sivil on Sat Sep 15, 2012 11:32 am

I dont think so, engrjhez. We should be specific and not in general. The DPWH has its own mission and function. We have also its own mission and function. Since the GPPB is the central depository of our government procurement ,therefore, the GPPB should stand. I for my self will not adhere the Department Order of the DPWH. I will rather adhere the GPPB Policy because it is mandated by law. Maybe we can get some inputs from the DPWH but the crafted guidelines from the GPPB must stand. I hope the GPPB may look into this matter. Thank you po and GBU.

dos_inhinyero_sivil
New Member
New Member

Male Number of posts : 19
Age : 50
Company/Agency : Philippine Public Safety College - DILG
Occupation/Designation : Engineer III- Head, BAC Secretariat
Registration date : 2012-07-02

http://www.ppsc.gov.ph

Back to top Go down

Re: Engineering Design, Supervision, Administrative and Other Cost (ESAO)

Post by engrjhez® on Sat Sep 15, 2012 11:47 am

dos_inhinyero_sivil wrote:I dont think so, engrjhez. We should be specific and not in general. The DPWH has its own mission and function. We have also its own mission and function. Since the GPPB is the central depository of our government procurement ,therefore, the GPPB should stand. I for my self will not adhere the Department Order of the DPWH. I will rather adhere the GPPB Policy because it is mandated by law. Maybe we can get some inputs from the DPWH but the crafted guidelines from the GPPB must stand. I hope the GPPB may look into this matter. Thank you po and GBU.

We are not saying that DPWH Guidelines are effective and binding to other agencies. In the absence of guidelines from GPPB, what will we use? The DPWH DO can only serve as a guide. To adopt it or not, remains to our discretion. Smile
avatar
engrjhez®
Grand Master
Grand Master

Male Number of posts : 2480
Age : 39
Company/Agency : City Government of Bacoor [Region IV-A, Province of Cavite]
Occupation/Designation : Office of the City Legal Service (OCLS) / Certified National Trainer - PhilGEPS
Registration date : 2008-10-31

http://www.bacoor.gov.ph

Back to top Go down

Re: Engineering Design, Supervision, Administrative and Other Cost (ESAO)

Post by Sponsored content


Sponsored content


Back to top Go down

View previous topic View next topic Back to top

- Similar topics

 
Permissions in this forum:
You cannot reply to topics in this forum