Construction of (MRF)

View previous topic View next topic Go down

Construction of (MRF)

Post by Guest on Wed Mar 22, 2017 11:24 am

Republic of the Philippines
Province of Dinagat Islands
Municipality of Basilisa
Barangay RITAGLENDA
-oOo-


Project Reference Number
Name of Project: CONSTRUCTION OF MATERIALS RECOVERY FACILITY
Location of the Project: Barangay Ritaglenda, Basilisa, Dinagat Islands

INVITATION TO APPLY FOR ELIGIBILITY AND TO BID

The Barangay of Ritaglenda of Basilisa Dinagat Islands, through it BIDS and AWARDS Committee (BAC) invites suppliers/manufacturers/distributors contractors to apply for eligibility and to Bid for the hereunder project:

Name of Project:            : PROCUREMENT OF  MATERIALS FOR MATERIAL RECOVERY FACILITY

Location                          : Brief Description                      
Approved budget:         : P 81,000.00
For the Contract            :
Contract Duration         :
Delivery Period              :

Prospective bidders should have experience  in undertaking a similar project within the last 2 years with an amount of at least 50% of the proposed Project for bidding. The eligibility Check screening as well as preliminary of Bids shall use non-discretionary “past/fail criteria Post Qualification of the lowest calculated bid shall be conducted.

All particulars relative to Eligibility Statement and screening, Bid security, Performance Security. Pre Bidding Conference(s), Evaluation of bids, Post Qualification Award of contract shall be governed by the pertinent provisions of RA 9184 and its implementing rules and Regulation (IRR).

The complete schedule of activities is listed as follows;

Activities Schedule
1.Issuance of Bids documents
2.Pre-bid conference N/A
Submission of letters intent and Application for eligibility(if single stage Bidding is used, delete this activity
N/A
4.Opening of Bids                          
5.Bid Evaluation
6.Post Qualification
7.Notice award
Bid documents will be available only to prospective bidders upon payment of non-refundable amount P200.00 to the barangay treasury office.

                                                                                                                                      Approved by:

                                                                                                                              HON. JAMES I. TORRES
                                                                                                                                      BAC Chairman
Date of Publication: Febraury 28, 2017.


Name of project: Construction of Materials Recovery Facility
Location: Barangay Ritaglenda Basilisa Dinagat Islands
Source of Fund: Municipal Assistance (P50,000.00)
: 20% Barangay Dev’t Fund (P 31,000.00)
Appropriation: P81,000.00
Subjects: Detailed Estimated

Item 1003: Carpentry Works

Quantity: 542.66 bd.ft
A. Materials Cost
96.00 bd.ft 6-4”X4”x12” wooden Post @: P 2,880.00
33.33 bd.ft 2-2”x5”x20” lumber @ : 999.90
81.67 bd.ft 7-2”x5”x14” lumber @ : 2,450.10
58.33 bd.ft 7-2”x5”x10” lumber @: 1,749.90
200.00 bd.ft30-2”x4”10” lumber @ 6,000.00
73.33 bd.ft 11-1”x8”x10” lumber @ 2,200.00
10 kls assorted C.W.N @1,000.00
Total ------------------------------------17,279.90
B. Labor cost
4 carpenter for 2 days x 350.00:P 2,800.00
1 helper for 2 days x 258 : 516
Direct cost : P20, 595.00
Unit cost : P 37.95
Item 101 :metal roofing corrugated GI
Quantity : 1 lot
A. Materials cost
28 pcs Ga.24 corr.GI shtx10 @450.00 P 12,600.00
7 pcs Ga.24 plain GI shtx8”@300.00 2,100.00
6 kilos umbrella nails @100.00 600.00
2 quarts roof sealant @ 300.00, 600.00
1 Gal. roof paint @700.00, 700.00
3 rolls cyclone wire x6” @800, 2,400.00
B. Labor cost
1 Tinsmith 1.5 days x 350.00, 525.00
3 carpenter 1.5 days x 350.00, 1,575.00
3 helper 1 1.5 days x 258.00, 1,161.00
Direct cost: P22,261.00
Unit cost: p 22, 261.00
Item 704: Masonry Works
Quantity: 24.00x1.00 : 24.00sq.m
A. 300 pcs CHB 4”x8” @: 16 P 4,800.00
13 bags Portland Cement @300: 3,900.00
60 cans washed sand @16: 960.00
18 pcs 10mmx16mm rebars @ 200: 3,600.00
1 kl. Tie Wire #16 @100: 100.00
B. Labor Cost
2 mason for 2 days@350: P 1,400.00
4 Helper for 2 days @ 258: 2,064.00
Total------------------------3, 464.00
Direct cost: P 16, 824.00
Unit Cost: P 701.00
Item 900 : Concrete Works
Flooring : 6.00 x 4.00x0.10: 2.40
Wallftg: 24.00x0.20x0.20: 0.96
Total -------------------------3.36sq.m
A. Materials cost
31 bags Portland Cement @300: P 9,300.00
4 cu.m Washed Gravel @780: P 3,120.00
2 cu.m Washed Sand @780: 1,560.00
2.50 klsTieWire #16 @100: 250.00
14 pcs 10mmx6mm rebars @200: 2,800.00
Total-----------------------------------17, 030.00
B. Labor cost
1 mason for 3 days 350@: P 1,050.00
4 Helper for days @258 : 3, 096.00
Direct cost: P 21, 176.00
Unit cost: P 6,302.00